Broiler
Cairo Poultry — Intensive Broilers
0
birds
Bird Capacity
0
barns
Barns Count
0
m²
Total Area
0
mo
Duration
2024
Year Completed
Project Details
Intensive broiler project in Greater Cairo with 180K batch capacity across 3 houses. Features integrated tunnel ventilation with 54-inch fans and Pad Cooling to maintain ideal temperatures in summer.
Execution Phases
From Construction to Handover — How We Deliver Your Project
01
Civil & Construction Works
Excavation, backfilling, foundations, load-bearing walls, and barn floor preparation with liquid drainage slopes.
Completed
02
Electrical & Smart Control
Industrial electrical wiring, distribution panels, PLC systems, and climate sensor integration with MI-OS.
Completed
03
Cage & Battery Installation
Installation of A-Type or H-Frame cages, slope calibration, feeding/water line fixation, and galvanizing inspection.
Completed
04
Cooling & Ventilation
Tunnel fan installation, Cooling Pads, air inlets, and positive pressure testing inside the house.
Completed
05
Feeding & Water Systems
Automatic feeding line installation, feed silos, nipple drinking systems, and flow testing.
Completed
06
Finishing & Handover
Final cleaning, comprehensive commissioning tests, farm team training, and key handover.
Completed
Broiler
Related Projects
Have a Similar Project?
Our engineering team studies your project and delivers a custom design and free quote within 48 hours.