Machinery
V-PRO Tunnel Ventilation Systems
0
mo
Duration
2026
Year Completed
Project Details
MI's V-PRO ventilation and cooling system series — includes tunnel fans in 54 and 50-inch diameters, high-absorbency cellulose Cooling Pads, and automatic control systems connected to MI-OS. Specifically designed for the hot climate of Egypt and the Gulf region.
Execution Phases
From Construction to Handover — How We Deliver Your Project
01
Engineering Design
3D CAD design, airflow simulation, and material selection per standards.
Completed
02
Cutting & Metal Forming
Steel cutting, bending, and punching to ±0.5mm tolerances using CNC.
Completed
03
Galvanizing & Surface Treatment
Hot-dip zinc galvanizing with 80-120 micron layer for 15+ year service life.
Completed
04
Assembly & Testing
Component assembly, dimensional calibration, and dynamic load testing.
Completed
05
Packaging & Shipping
Reinforced export packaging, container loading, and quality certification issuance.
Completed
Machinery
Related Projects
Have a Similar Project?
Our engineering team studies your project and delivers a custom design and free quote within 48 hours.